Electricity Licencing Guidelines and Requirements 2024
This document by the Zimbabwe Energy Regulatory Authority (ZERA) outlines guidelines for licensing electricity undertakings above 100 kW, covering generation, transmission, distribution, and supply. It defines three licence categories and provides a framework to promote competition and efficiency in Zimbabwe’s electricity sector.
Zimbabwean Electricity (Net Metering) (Amendment) Regulations, 2022 (No. 1)
This document amends Zimbabwe’s 2018 Net Metering Regulation. It expands eligibility to systems up to 5 MW, revises crediting rates for exported electricity, updates technical requirements for grid interconnection, and introduces detailed net metering connection guidelines to enhance safety, compatibility, and operational standards for renewable energy systems.