• Requirements for Embedded Generation

    Conditions and application process to become a grid-tied embedded generator in the Eswatini Electricity Company electrical network.

  • Embedded Generation Bylaws 2024

    Embedded Generation Bylaws 2024

  • The Eswatini Energy Masterplan 2034

    The masterplan forecast’s outcomes of the current and planned policies in the energy system to the year 2034 and shows comparative scenario results that assume deployment of diverse technologies and measures to meet the country’s energy demand which the private sector can use in their plans.

    Authours: Ministry of Natural Resources and Energy

  • The Eswatini Energy Regulatory Act, 2007

    The act regulates the generation, transmission, distribution and supply of electricity in Eswatini.

  • Eswatini Energy Act, 2007

    The act to reform and consolidate the law regulating the generation, transmission, distribution and supply of electricity and to provide for matters incidental thereto.

  • Short-Term Generation Expansion Plan for Eswatini

    The document is based on the Energy Masterplan. It is a short-term (5-year) power sector generation plan, where two power generation technologies are prioritised i.e. solar and biomass.
    Authour:by Energy System Planning (Pty) Ltd

  • Eswatini National Energy Policy

    The Policy recognizes and discusses the issue of eradication of energy poverty mainly in rural areas.

  • Swaziland (Eswatini) Independent Power Producer Policy

    Seeks to address barriers to energy generation development and IPP growth to enable a successful transition of Eswatini’s energy matrix towards sustainable energy sources and to open the market to the private sector in a controlled way via IPPs.
    Authour: USAID Southern Africa

  • The Eswatini Grid Code

    This document legally establishes technical and other requirements for the connection to and use of an electrical utility in a manner that will ensure reliable, efficient, and safe operation.

  • Eswatini Energy System Transformation Overview (ESTO)

    The purpose of the Energy System Transformation Outlook (ESTO) is to document a high level summary of the electricity landscape
    in Eswatini and to present the outcome of a high level overview and assessment that followed a ‘ interview, identify’
    approach.

    (March 2023)