• Short-Term Generation Expansion Plan for Eswatini

    The document is based on the Energy Masterplan. It is a short-term (5-year) power sector generation plan, where two power generation technologies are prioritised i.e. solar and biomass.
    Authour:by Energy System Planning (Pty) Ltd

  • Namibian Electricity Act 2007, amended in 2016 (Net Metering Rules)

    This document seeks to reduce the investment requirements for independent producers adding power into the national grid, and to allow customers who generate their own energy to reduce their reliance on the grid, and to promote the production and use of sustainable renewable energy sources including in small scale projects. All renewable energy technologies are eligible for net metering. All distribution consumers are allowed to install net metered facilities. The document sets the regulatory framework on net metering, including carbon credits for consumers who self-generate energy.
    Authour: Ministry of Mines and Energy

  • Eswatini National Energy Policy

    The Policy recognizes and discusses the issue of eradication of energy poverty mainly in rural areas.

  • Lesotho Energy Policy 2015-2025

    The energy policy sets out the strategic direction of the country’s energy sector developments.

  • Uganda: Captive Power

    Model Business Case: Solar Photovoltaic (PV) for Commercial and Industrial Facilities
    Authour: GET.invest

  • Namibian Embedded Generation Standard (EGS) – Final Draft

    A set of standards that ensure safe electrical installation work relating to embedded generation activities. The standards are legally enforcable and ensure uniformity by stakeholders within the Namibian ESI.
    Author: Shootecc Engineering CC

  • Swaziland (Eswatini) Independent Power Producer Policy

    Seeks to address barriers to energy generation development and IPP growth to enable a successful transition of Eswatini’s energy matrix towards sustainable energy sources and to open the market to the private sector in a controlled way via IPPs.
    Authour: USAID Southern Africa

  • The Eswatini Grid Code

    This document legally establishes technical and other requirements for the connection to and use of an electrical utility in a manner that will ensure reliable, efficient, and safe operation.

  • Namibia Renewable Energy Grid Code: Final

    These are the set of rules which define conditions for accessing the electricity grid.

  • Namibia Energy System Transformation Outlook (ESTO)

    The purpose of the Energy System Transformation Outlook (ESTO) is to document a high level summary of the electricity landscape in Namibia and is the outcome of a high level overview and assessment that followed a ‘ interview, identify’ approach.  The ‘review’ phase focused on a desk top review of a multitude of publicly available energy and power sector publications.

    The ‘interview’ phase focused on further discussions with the key public sector actors (MME, NamPower, and ECB) to identify
    potential needs, opportunities and gaps, and culminated in the public sector actors formally expressing their key priority needs.

    The ‘identify’ phase focused on defining potential technical assistance and capacity building projects that will strongly support a
    power transition in Namibia and that GET transform is well positioned to support It also provides a starting point for further
    engagement with the public sector and other donor agencies.